TxDOT are expected to be doing overlay work this week on FM 1615 between SH 19 and the End of State Maintenance as well as conducting base repairs on various roadways around the county. Be prepared for lane closures with flaggers directing traffic through the work zones.
In addition, the following construction projects will continue: SH 31 Repair Project (.09 miles west of FM 317 eastward to .34 miles west of FM 773); US 175 Widening Phase I (0.1 miles southeast of FM 804 near Baxter southeast to 1.1 miles east of Loop 60E at Larue) and Phase II (1.1 miles east of Loop 60B to 0.85 mile east of FM 315); FM 315/FM 1616 Widening (from FM 314S to CS End at County Road 4325, 4224, etc.); Cardinal Drive bridge replacement in Murchison.